WILLOW ISLAND COMBINED CYCLE PLANT
MW120Tasks1Updated6d
Working document Rev A
Willow Island named to Anam and Kokosing: about 120 MW headroom at a coal plant with hydrogen production on site; owner seeking an offtaker and offering MicroLink an equity stake of about $50M; Kokosing named it with Ohio One as its fit. Source: Ohio Land and Kokosing calls 12 Oct 2026.
Hales Gymnasium and Crane Pool
MWAbout 5Tasks2Updated6d
Ever-Green call held 9 Oct; proposal concepts with renderings owed early this week
Kokosing has a strong existing relationship with Oberlin College; told Nick the whole town sits on a 25 MW grid. Nick told ALH the Ever-Green pitch went out 12 Oct, angled at the 1.25 MW pod pilot. Source: Kokosing and ALH calls 12 Oct 2026.
Holyoke MA
MWAbout 4Tasks0Updated6d
Call held 12 Oct; not recorded
Call held 12 Oct with John Goodhue and Melisa Sarnecki; Granola captured room audio only, so nothing from the call is on record. Leonidas (BU) earlier that day described MGHPCC as research and coursework compute with weaker reliability than public cloud. Source: Leonidas call and Granola 12 Oct 2026.
KBC Advisors
MW30Tasks27Updated6d
LOI signed with the landowner; contract expected this week; 90 day study window
LOI signed with the landowner, contract expected this week, 90 day study under way (Nexus gas, air permit, town approval); 30 MW grid now, 450 MW by 2030, 800 MW by 2032; a customer asked for 200 MW on Friday. Load study due 10 to 20 Nov; town meetings in about 1.5 weeks; Nexus meeting next week. Anam wants to pay only for confirmed power (75 MW by Q1 2028); Vorys flags Ohio Power Siting Board thresholds and farmland sensitivity; Kokosing (union, in JV on Vantage) wants its MNDA signed first; SSOE asking in on design; CBRE NDA executed; CoreWeave MNDA sent. Source: Kokosing, Ohio Land, Vorys and ALH calls 12 Oct; emails 12 Oct 2026.
MW3Tasks0Updated7d
Build as needed; gas supply and generators first, racks later
Discussed with Heath Andersen and named to Haley & Aldrich as 3 MW expanding to 10 MW. Source: Heath and Haley & Aldrich calls 9 Oct 2026.
Assembly District 116
MW200Tasks1Updated7d
Warm intro to the operator offered by Acculon/Adakon; C&W may need to recuse
Raised with DOE Office of Indian Energy as a former Alcoa smelter with about 200 MW allocated grid and Mohawk involvement; the Mohawk are not in DOE's cohort. Source: DOE call 8 Oct 2026.
downtown Chicago
MW21Tasks2Updated7d
JLL introduction held 29 Sep; JLL shortlisting loop buildings before a Chicago visit in about three weeks
JLL sees the 1.25 MW pod fitting its assets: a former XO Communications space in an OHP building already plumbed for a 1.25 MW pod, the owner holding 7 more Chicagoland sites, 29 JLL managed offices beside the CenTrio line, an Aon site up to 4 MW. JLL wants cooling range and rack density options and a pod proposal. CenTrio check in Tue 13 Oct. Source: JLL call 9 Oct 2026 and calendar.
Chicago
MW Tasks0Updated17d
Working document sent 28 Sep; second meeting being asked for
Raised with C&W as the community wastewater site next to the CenTrio work, with corporate farming offtakers and a thermal land network in view; a Public Benefit LLC with partial community ownership floated in the Academic Paper Series call. Second meeting with Nathaniel Cook still being asked for. Source: C&W call 29 Sep and Academic Paper Series 1 Oct 2026.
Laramie
MW Tasks1Updated17d
Geothermal option opened with Sage Geosystems; introduction to the landowner pending
23 km² near Laramie, willing landowner with full rights and political connections, SMR also planned on site; Nick to forward Sage's deck and introduce Lev Ring if interest is confirmed. Source: Sage Geosystems call 29 Sep 2026.
Grays Ferry (Vicinity)
MW40Tasks2Updated17d
Technical site built; Vertiv 40 MW budgetary drawings requested
Rondo proposed charging its heat battery in Vicinity's low demand hours and discharging to the 45 MW load; needs 200 MW plus charge rate; pitch as a dispatchable PJM asset. NDA, then site data, then a follow-up late in the week of 5 Oct. Source: Rondo call 1 Oct 2026.
UNIVERSITY R&D BENCHMARK (LEHIGH)
MW8Tasks1Updated25d
Concept and proposal
DG Matrix offered a single line diagram for Bethlehem (8 MW) or Chicago once an NDA is in place. Source: DG Matrix call 23 Sep 2026.
MIXED EU REGISTER
MW Tasks0Updated28d
Register and template built
Collecting every possible European site in one register
Lee County
MW1,000Tasks0Updated28d
One pager held; compute ready 2028
1 GW platform: 500 MW solar, 500 MW BESS, 500 MW reliability generation
NYC DEP WASTEWATER WORKS
MW40Tasks0Updated28d
Feasibility constrained
Newtown Creek Alliance met 13 Mar
Rocky Mount (Cushman & Wakefield)
MW Tasks0Updated28d
Offered by C&W, reviewed Aug
Sent by Anne Rosenau, Cushman & Wakefield
SAN JOSE-SANTA CLARA RWF WITH PROLOGIS
MW35Tasks0Updated28d
Prologis met 16 Apr; Jacobs last met 1 Jun
Prologis data centre investment team is the route
DISTRICT COOLING NETWORKS
MW200Tasks0Updated28d
Stage plan: technology verification first
200 to 300 MW programme working document opened 30 Aug
18 sites, ordered by when each was last written. The open task count is derived off site_tasks at request time.