Daybreak / Philadelphia
Monday 19 October 2026
P
Philadelphia
SITEGrays Ferry (Vicinity)
DISTRICT STEAM1.25 pilot, 40 expanded MW2 TASKS OPEN
HOST TYPE
District steam, Grays Ferry (Vicinity)
sites.host_type
MEGAWATTS
1.25 pilot, 40 expanded
sites.mw
STAGE
Technical site built; Vertiv 40 MW budgetary drawings requested
sites.stage
STATUS
Rondo proposed charging its heat battery in Vicinity's low demand hours and discharging to the 45 MW load; needs 200 MW plus charge rate; pitch as a dispatchable PJM asset. NDA, then site data, then a follow-up late in the week of 5 Oct. Source: Rondo call 1 Oct 2026.
sites.status_line
WHAT IT ISTHE STATUS LINE, AS WRITTEN
Rondo proposed charging its heat battery in Vicinity's low demand hours and discharging to the 45 MW load; needs 200 MW plus charge rate; pitch as a dispatchable PJM asset. NDA, then site data, then a follow-up late in the week of 5 Oct. Source: Rondo call 1 Oct 2026.
WHAT IS OWED2 OPEN · 0 DONE · 0 BLOCKED
Nick
Reply to Vertiv on the 40 MW budgetary drawingsno date
Sign an NDA with Rondo, then send the Vicinity site datano date
MEETINGS HERENONE JOINED
No meeting is joined to this site. put_site_link joins one, kind encounter.
ORGANISATIONS HERENONE JOINED
No organisation is joined to this site.
PEOPLE HERENOBODY JOINED
Nobody is joined to this site.
DOCUMENTS HELDNONE HELD
No document is joined to this site.
KEY FACTS
Host typeDistrict steam, Grays Ferry (Vicinity)
MW1.25 pilot, 40 expanded
StageTechnical site built; Vertiv 40 MW budgetary drawings requested
Tasks open2
Organisationsnone joined
Record age17 days
SILENCE
Last meetingno meeting joined
Quiet forno meeting to count from
Throughnothing joined