Daybreak / Genoa, Ohio One
Monday 19 October 2026
GO

Genoa, Ohio One

SITE
KBC Advisors
GENOA INDUSTRIAL PARK30 grid now plus 400 later (LOI assumes about 430); about 800 IT with Nexus gas; Phase 1 50 MW27 TASKS OPEN
HOST TYPE
Genoa Industrial Park, KBC Advisors
sites.host_type
MEGAWATTS
30 grid now plus 400 later (LOI assumes about 430); about 800 IT with Nexus gas; Phase 1 50
sites.mw
STAGE
LOI signed with the landowner; contract expected this week; 90 day study window
sites.stage
STATUS
LOI signed with the landowner, contract expected this week, 90 day study under way (Nexus gas, air permit, town approval); 30 MW grid now, 450 MW by 2030, 800 MW by 2032; a customer asked for 200 MW on Friday. Load study due 10 to 20 Nov; town meetings in about 1.5 weeks; Nexus meeting next week. Anam wants to pay only for confirmed power (75 MW by Q1 2028); Vorys flags Ohio Power Siting Board thresholds and farmland sensitivity; Kokosing (union, in JV on Vantage) wants its MNDA signed first; SSOE asking in on design; CBRE NDA executed; CoreWeave MNDA sent. Source: Kokosing, Ohio Land, Vorys and ALH calls 12 Oct; emails 12 Oct 2026.
sites.status_line
WHAT IT ISTHE STATUS LINE, AS WRITTEN
LOI signed with the landowner, contract expected this week, 90 day study under way (Nexus gas, air permit, town approval); 30 MW grid now, 450 MW by 2030, 800 MW by 2032; a customer asked for 200 MW on Friday. Load study due 10 to 20 Nov; town meetings in about 1.5 weeks; Nexus meeting next week. Anam wants to pay only for confirmed power (75 MW by Q1 2028); Vorys flags Ohio Power Siting Board thresholds and farmland sensitivity; Kokosing (union, in JV on Vantage) wants its MNDA signed first; SSOE asking in on design; CBRE NDA executed; CoreWeave MNDA sent. Source: Kokosing, Ohio Land, Vorys and ALH calls 12 Oct; emails 12 Oct 2026.
WHAT IS OWED27 OPEN · 0 DONE · 2 BLOCKED
Nick
Sign off Anne's revised Genoa LOI redline so it can go to the seller2 Oct
Add Dennis to the Genoa invite, as Heath askedno date
Send Skyven the Galileo inputs: MWth recoverable from 100 MW and farm heat demandno date
Decide adjacent parcels now or after close, and first right of refusalno date
Give Rebound (Russell, Tom) Pinky access for the two week Ohio One thermal sprintno date
Set a date for the Vertiv on site meeting at Ohio Oneno dateblocked by Owner discussion; date not yet set
Sign the C&W representation agreement and the dual agency formno date
Engage a consultant on gas generation confirmation and timing, as Anne suggestedno date
Send the Anthropic campus pitch and set up the joint NVIDIA, Anthropic and Vertiv call for end of next weekno date
Review Sitepower's draft Ohio One agreementno date
Book the Onterris call on the Ohio permitting proposalno date
Open the Ohio One VDR to Jared Carlno date
Answer Greg Lehman on the LOI and the in person meetingno date
Tell Convergen whether a 10 MW biomass block fits the first 50 MW before the 13 to 14 Oct auction12 Oct
Send Belden the Ohio One master contact list, data room access and the heat partner listno date
Answer Stack District: is the 30 MW energized, and is Q1 2028 committedno date
Revert to CBRE on 150 to 200 MW feasibility in 2028 for its tenant16 Oct
Send Vultr the Ohio One deck, data room and the Europe data room; confirm NDA statusno date
Answer Hut 8 on timing for the 30 MW, via Nigel at SitePowerno date
Sign Kokosing's MNDA, then share the Ohio One data room; take Gary's McKinsey waste heat introno date
Sign CoreWeave's MNDA by DocuSign (no changes accepted)no date
Share the Ohio One data room with Roger, Kristian and Rob (Anam, Solstice)no dateblocked by November load study for pricing
Await the Vorys engagement letter; find separate counsel for customer leasesno date
Answer Baxtel on rack densities for Ohio Oneno date
C&W (Dan, Adrian, Domenic)
Scope the independent power consultant for Genoano date
Nick, Anne
Engage Nexus on a gas supply agreement as a condition of closingno date
Answer the seller's broker: 1% deposit, 90 day study, 30 day close, 75 ft stacks, ROFO needs8 Oct
MEETINGS HERENONE JOINED
No meeting is joined to this site. put_site_link joins one, kind encounter.
ORGANISATIONS HERENONE JOINED
No organisation is joined to this site.
PEOPLE HERENOBODY JOINED
Nobody is joined to this site.
DOCUMENTS HELDNONE HELD
No document is joined to this site.
KEY FACTS
Host typeGenoa Industrial Park, KBC Advisors
MW30 grid now plus 400 later (LOI assumes about 430); about 800 IT with Nexus gas; Phase 1 50
StageLOI signed with the landowner; contract expected this week; 90 day study window
Tasks open27
Organisationsnone joined
Record age6 days
SILENCE
Last meetingno meeting joined
Quiet forno meeting to count from