Service profile
PPL Electric Utilities
electricityITS FACTS ARE HELD HERE ONCE, NOT COPIED ONTO EACH PLACE
Its own record
| name | PPL Electric Utilities, headquartered in Allentown |
| customers | about 1.4 to 1.5 million across 29 counties |
| queue | Total data centre interconnection queue about 60 GW. Advanced stages, meaning executed letters of agreement or electric service agreements with meaningful financial commitments, about 25.2 GW at the Q4 2025 call, up about 23 percent quarter on quarter, per CEO Vincent Sorgi |
| queue trajectory | 28.3 GW at the Q1 2026 call, about 32 GW at Q2 2026 |
| load projection | Advanced stage data centre load rising from about 800 MW in 2026 to about 14.4 GW by 2034 |
| constraint map | None published. PPL explicitly declines to publish feeder hosting capacity and provides only pre application site specific data on request |
| transmission | Proposing new transmission lines and a substation in South Whitehall Township near a proposed data centre site |
Open proceedings
PA General Assembly
2025-2026 session · Final disposition of the data centre tax exemption repeal and Senate action on the Lightning Plan · open
PJM
2026 · Cycle 1 validation of 811 projects and 220 GW, window closed 2026-04-27 · ongoing
PPL and Blackstone joint venture
2026 · Possible certificate of public convenience and necessity filing for new generation · possible
FERC
2026-09-01 · Alternative Dispute Resolution forum commences · open
FERC and RTOs
2026-09-16 · Interested party comments, 30 days after the 17 August filings, non abeyance dockets · open
EPA
2026-10-30 · GHG Reporting Program reporting year 2025 report due, extended · open
PA electorate
2026-11 · Governor election, Shapiro against Garrity, with energy policy divergence over the Lightning Plan and PACER · upcoming
PECO and PA PUC
2026-12 · Next semi annual price to compare reset · upcoming
FERC and RTOs
2026-12-15 · Interested party comments, 30 days after the suspended filing deadline, abeyance dockets · open
PA PUC
2026-2027 · Decision on the PECO 429 million dollar distribution rate case filed 2026-03-30 · upcoming
EPA
2027-03-31 · GHG Reporting Program reporting year 2026 report due, standard deadline · open
IRS
2027-12-31 · Section 48E placed in service cut off for wind and solar where construction began after 2026-07-04 or 05 · open
Thresholds, against a 1.25 MW pod
| FERC ANOPR large load | 20 MW | 1.25 MW pod is under it |
| FERC show cause large load | 50 MW peak above 69 kV | 1.25 MW pod is under it |
| GHG reporting, Part 98 | 25 000 tonnes CO2e a year | not reached by a single pod |
| Title V major source | varies, 25 to 100 tons a year | not reached by a single pod |
A 1.25 MW pod clears none of these thresholds, which is the point: the pod is small enough to sit under the rules that are currently reshaping large load interconnection. Thresholds are read from rules, not from this service.
Where this profile is used
Lehigh Valley metro
The electric distribution company here, publishing no hosting capacity map
Pennsylvania state
Distribution across 29 counties, about 1.4 to 1.5 million customers
Sources this profile is read from
CAISO queue XLSX
interconnection · joins to neither
EIA APIv2 JSON
curtailment · joins to neither
ENTSO-E Transparency Platform XML
curtailment and interconnection · joins to organisation
ERCOT GIS Report XLSX, ZIP
interconnection · joins to neither
MISO GI Queue XLSX, CSV
interconnection · joins to neither
MaStR SOAP SOAP XML
interconnection · joins to organisation
MaStR bulk XML in ZIP
interconnection · joins to organisation
NESO Data Portal, CKAN JSON, CSV
interconnection · joins to organisation
PJM Data Miner 2 JSON
interconnection · joins to neither
SPP GI Active CSV
interconnection · joins to neither