Daybreak / Pennsylvania
Wednesday 21 October 2026

State profile

Pennsylvania

United States/Pennsylvania
8 OF 13 FIELDS DECIDED HERE, 5 ANSWERED ABOVE

Map

Pennsylvania

Map placeholder. Nothing is drawn yet: no coordinate is held for this place in any table, so a map here would be an illustration rather than a reading.

Heat networkHeat userIndustrial landAvailable capacity

PJM Interconnection, as it applies here

ServicePJM Interconnection
Kindmarket operator
Decides hereCapacity price, interconnection queue and study cycle for the whole state

One card only. The full record lives on the PJM Interconnection profile, and this is a window into it rather than a copy of it.

Inherited, not restated

Heat networkanswered above, not restated hereFEDERAL
Planning and zoning authorityanswered above, not restated hereMUNICIPAL
Permitting timelineanswered above, not restated hereMUNICIPAL
Water and dischargeanswered above, not restated hereMUNICIPAL
Industrial landanswered above, not restated hereFEDERAL

The value is held once, on the place that owns it. This block names the level so the reader knows which body would have to change its mind.

Decided here

Electricity price and tariff{"pjm_capacity_2026_27":{"price":"329.17 dollars per MW-day UCAP, cleared at the FERC approved cap","secured_mw":134311,"announced":"2025-07-22","source":"PJM Inside Lines"},"pjm_capacity_2027_28":{"price":"333.44 dollars per MW-day UCAP, up 1.3 percent, agai…STATE
Interconnection queue{"turnaround":"One to two year study turnaround under the reformed process, no backlog remaining","signed_not_built":"About 46 GW as of mid 2025","cycle_1":"811 projects and 220 GW applied, window closed 2026-04-27, announced 2026-04-29","transition_cycle_1":…REGIONAL
Grid constraint mapNo statewide map. Utility level only. PJM publishes the new services queueUTILITY
Transmission and distribution ownerFour investor owned utilities serve about 99 percent of customers: PECO under Exelon, PPL Electric, Duquesne Light, and FirstEnergy PA covering Met-Ed, Penelec and West Penn Power. PJM is the RTOSTATE
Emissions rules{"rggi":"Repealed by Act 45 in the 2025-26 budget, signed November 2025. PA Supreme Court dismissed pending appeals as moot 2026-01-08","carbon_price":"None in force","proposed":"PACER cap and invest on fossil plants above 25 MW, part of the Lightning Plan, n…STATE
Tax treatment{"programme":"Computer Data Center Equipment Exemption Program, Act 25 of 2021, building on Act 84 of 2016 and Act 13 of 2019","effective":"2022-01-01","benefit":"Uncapped sales and use tax exemption on qualifying equipment, running to 2032, retained across o…STATE
Incentive programmes[{"name":"PA SITES site readiness grants","amount":"400 million dollars under the 2024-25 budget; first round 64 million to 11 sites including 30 million to the Navy Yard","body":"DCED"},{"name":"PA EDGE tax credit expansion and Community Energy Act","status"…STATE
Deciding bodies{"docket":"M-2025-3054271, Interconnection and Tariffs for Large Load Customers","timeline":["2025-04-24 en banc hearing","2025-11-06 Tentative Order, published 2025-11-22, comments to 2025-12-22","2026-05-13 Final Order establishing the model tariff"],"terms…STATE

Universities and campuses 0

None named here.

Other large heat users 0

None named here.

Bodies that decide 2

PA DCED and Department of Revenue absent
Incentives and tax administration · GOVERNMENT · no organisations row, not created
PA PUC absent
Utility regulator · GOVERNMENT · no organisations row, not created

No published source

Every field below is named in the record shape and carries no published source in what has been loaded. A field with no source is not a field with no answer: it is a field nobody has been asked for yet.

Every field carries a source name.

Also unheld for this place: a coordinate, a boundary, and a published capacity figure per substation. None of the three has a column in any table today.

What the research corpus says about this place

- **State and local.** Pennsylvania DCED grants (DrinkPAK received a 2 million dollar DCED grant at the Bellwether site); Keystone Opportunity Zone tax breaks (extended at the Bellwether site to 2043); and city beverage tax funded amenities are all live chann…
An Evidence Based Playbook for Durable Jobs and Community Benefit at the MicroLink Grays Ferry Campus.md · line 37 · 2043
The flagship marginalised-youth precedent is the three-year NVIDIA–Boys & Girls Clubs of Western Pennsylvania "AI Pathways Institute" partnership (launched from a 2019 pilot of 40 youth, majority girls and students of colour), which scaled a summer camp into …
Anchoring the Educational and Digital-Inclusion Component of the MicroLink Cape Flats WWTW Pilot Programme Recommendation.md · line 16 · 2019
The Pennsylvania PUC issued a tentative model-tariff order (Nov. 6, 2025, Docket M-2025-3054271) for large-load customers (≥50 MW individually / 100 MW aggregate).
Bethlehem & the Lehigh Valley as a Data Center University-Partnered Infrastructure Location A Site & Community Intelligence Report for MicroLink Data Centers.md · line 75 · Nov. 6, 2025
**State incentives (confirmed).** Pennsylvania's Computer Data Center Equipment Sales and Use Tax Exemption (Act 84 of 2016, amended by Act 13 of 2019 and Act 25 of 2021) exempts qualifying data-center equipment from the 6% state sales/use tax for 25 years, f…
Bethlehem & the Lehigh Valley as a Data Center University-Partnered Infrastructure Location A Site & Community Intelligence Report for MicroLink Data Centers.md · line 85 · 2016