Daybreak / Philadelphia Water Department, Northeast Water Pollution Control Plant
Wednesday 21 October 2026

Philadelphia Water Department, Northeast Water Pollution Control Plant

City of Philadelphia, Philadelphia Water Department
strongphiladelphiaPHILADELPHIA COUNTY

Temperature

not found
not found
the field that decides whether a lift is needed

Owner

City of Philadelphia, Philadelphia Water Department is not in the register, so there is nothing to link to. Recorded as absent and not created by the loader.

Place

The record

What it isMunicipal wastewater treatment plant, one of three PWD water pollution control plants
Heat evidenceAnaerobic digesters plus a biogas cogeneration facility, a PWD and Ameresco project, providing up to 85 percent of plant electricity and offsetting over 20 000 tonnes CO2e a year, serving an average flow of 379 MGD for 2.2 million people. The cogeneration facility generates 5.6 MW of thermal energy and electricity from biogas
Temperaturenot found
Fuelbiogas methane with natural gas supplement
CapacityPWD three plants combined design capacity 522 MGD, peak over 1 billion gallons, maximum 1.044 billion gallons a day
UtilityPECO
Electrical detailnot found; cogeneration operates in parallel with the utility grid
LandLarge riverfront plant site with plain space, estimated from aerial imagery, not a published site plan
Capital signalBiogas cogeneration online 2012 under a 16 year Ameresco contract. Biosolids master plan expected to complete summer 2027
SignatoryPhiladelphia Water Commissioner, Ben Jewell named. Decision body City of Philadelphia
CityPhiladelphia
CountyPhiladelphia

Sources

EPA US Brazil Joint Initiative on Urban Sustainability, PWD Biogas Cogeneration Facility, archive.epa.gov, 2012
no published date
Grid Magazine, gridphilly.com, 2026-06-01
no published date
Philadelphia Water Department, Resource Recovery and Energy Production, water.phila.gov, undated
no published date

Nothing published for

Temperaturenot found
Electrical detailnot found