Daybreak / Lehigh County Authority Pre-Treatment Wastewater Facility, Fogelsville
Wednesday 21 October 2026

Lehigh County Authority Pre-Treatment Wastewater Facility, Fogelsville

Lehigh County Authority, municipal authority
thin on heat, strong on ownership and capitallehigh-valleyLEHIGH COUNTY

Temperature

not found
not found
the field that decides whether a lift is needed

Owner

Lehigh County Authority, municipal authority is not in the register, so there is nothing to link to. Recorded as absent and not created by the loader.

Place

The record

What it isIndustrial wastewater pretreatment plant, a 5.75 MGD pure oxygen facility handling high strength waste
Heat evidenceHigh strength industrial waste handling with specialised technology. Anaerobic or thermal process heat not clearly published
Temperaturenot found
Fuelnot found
Capacity5.75 MGD design
UtilityPPL Electric Utilities
Electrical detailnot found
LandIndustrial site with space, estimated from imagery
Capital signalAbout 267 million dollars of upgrades earmarked for the pretreatment plant within the larger LCA programme. The facility is described as at the end of its useful life and at capacity for high strength waste
SignatoryLehigh County Authority CEO Liesel Gross and board
CityUpper Macungie Township, 7676 Industrial Boulevard
CountyLehigh

Sources

LehighValleyNews.com, undated
no published date
Treatment Plant Operator, tpomag.com, 2020
no published date

Nothing published for

Temperaturenot found
Fuelnot found
Electrical detailnot found