Active broker and advisory relationship on Ohio One. Meetings 15 Sep (for sale call), 17 Sep (site discussion, NDA signed, VDR access), 18 Sep (update), 24 Sep (external working group). Notebook: 7 MW to 80 MW, Q1 next year, 10% investment grade, $250k (first meeting); couple of offers already, 400 MW, November, under contract, gas check 2.5 mile, mineral rights, water and road (third meeting).
Granola transcripts Sep 2026; Nick's notebook p1, p9, p19, p29, p39
OPERATING
Open slot
ENRICHApollo and Clay
WHAT THEY WANTNEXT
A clean seller one pager (30 MW availability, upgrade timelines, gas, water, acreage discrepancies); an independent power consultant; an offer letter 3 to 4 days after the one pager, contingent on 400 MW confirmation; sale contingent on permit approval; Anne to review the pitch deck before it goes out.
Granola transcripts 15 and 24 Sep
OWNER
Open slot
CAPTUREManual
WHAT THEY AREDRAWN FROM THE TRANSCRIPT

Talked through food deserts in Philadelphia and the school programmes attached to them, and their ability to run due diligence on a site. That sits alongside the site pipeline Annie is already feeding us.

Open. Annie asked last night for a call this morning on the marked up NDA for the 425 to 882 acre, 500 MW Ohio site. She also sent the fully executed NDA for the Western Oklahoma 7 MW site. Neither has been answered.

Role on Ohio One

  • Anne Rosenau, Dan Fuchs, Adrian Conforti, Corbin Jones, Domenic Skunda on the MicroLink side; Domenic is the Ohio data centre broker
  • Michael Duderstadt (Chicago office) represents the seller, Canova / Kenmore Construction
  • Incentives group (Amy) paid on success
  • Midwest full service engineering resource available for power verification

Genoa site as presented

  • 23620 State Route 163; ~1,200 acres, Phase 1 482 acres under contract
  • Zoned M-4, data centre permitted by right; 85% lot coverage, 22.9 m (75 ft) height
  • 30 MW now needs $14M 69 kV upgrade; 400 MW by 2029 $36M 138 kV; 500 MW adds $44M 345 kV, 800 MW 2031 to 2032
  • Asking $110M (~$228K/acre) on 15 Sep; $25M on a 400 MW basis on 24 Sep
  • Water 1.2M to 2M gallons/day, $10M to $15M upgrade; gas 0.4 km east, 200,000 DTH/day
PEOPLE HERE12 ON FILE
AGAli Greenwood
Executive Director
Last touch 2 JunCONTACTED ONLY
KSkip.soltesz@cushwake.com
kip.soltesz@cushwake.com
Met 25 JunCONTACTED ONLY
LMluke.marchand@cushwake.com
luke.marchand@cushwake.com
Met 25 JunCONTACTED ONLY
CJcorbin.jones@cushwake.com
corbin.jones@cushwake.com
Met 28 JulDEAD ADDRESS
AUAdrian Conforti/USA
adrian.conforti@cushwake.com
Met 15 JulMET
AUAnne Rosenau/USA
anne.rosenau@cushwake.com
Met 9 JunMET
BUBen Mann/USA
ben.mann@cushwake.com
Met 25 JunMET
DUDan Fuchs/USA
daniel.fuchs@cushwake.com
Met 23 JulMET
DUDavid Nikoley/USA
david.nikoley@cushwake.com
Met 23 JulMET
JMJohn McWilliams
Director
Met 9 JunMET
MUMike Murtaugh/USA
michael.murtaugh@cushwake.com
Met 23 JulMET
DFDave Fanning
Director
No touchON FILE
MENTIONED BYNOBODY HAS NAMED THEM YET
No mention of them in any other transcript.
WHO THEY MENTIONEDEACH ROW WRITES TO BOTH PROFILES
They have named nobody in a transcript held here.
WHAT THEY SAIDVERBATIM · FEEDS THE TODAY SHEET
OFFERS
"Let me know if there are any additional changes or if it is ready to send."
Anne Rosenau, Cushman & Wakefield · LOI · 1d
"We now have ~540 AC under contract and are negotiating contracts with the other groups on Phase 2 and 3. You just need to let us know how much you want / need?"
Michael Duderstadt, Cushman & Wakefield · Land · 4d
"Domenic and I have gone through it and would like to set up a call with you and Adrian and Dan's team to discuss it."
Anne Rosenau, Cushman & Wakefield · Ohio One working group call · 1d
OBJECTIONS
"They felt the deposit was light and he said they would likely come back at 1%"
Anne Rosenau relaying the seller's broker, Cushman & Wakefield · Deposit pushback · 0d
"I'm pretty sure they won't accept our offer and will engage with us back-and-forth."
Anne Rosenau, Cushman & Wakefield · Land negotiation · 1d
"The broker told me based on the offers they had we needed to offer at least $125MM."
Anne Rosenau, Cushman & Wakefield · Genoa price floor · 1d
"They are not willing to have you talk to the town as they do not want them to get excited about your offering if they do not select our offer."
Anne Rosenau, Cushman & Wakefield · Access · 1d
"He said pricing was originally $100MM but based on the offers he has we would need to be at $120MM."
Anne Rosenau, Cushman & Wakefield · Price · 1d
SUGGESTIONS
"I think we need to engage as soon as we can."
Anne Rosenau, Cushman & Wakefield · Timing · 1d
"I would suggest that since the ability to use gas generation in the meantime is so important that you engage a consultant to start working on the confirmation and timing."
Anne Rosenau, Cushman & Wakefield · Genoa gas bridge · 1d
"I just still feel like you might wanna get a power consultant just to give you that confirmation on what it is that they've given you."
Anne Rosenau, Cushman & Wakefield · Power verification · 1d
IMPORTANT DATESCOMPANY LEVEL, PEOPLE ROLLED IN
20 Aug 2026
MET
RE: Cushman Wakefield and MicroLink
Google Calendar
28 Jul 2026
MET
C&W/Microlink
Google Calendar
23 Jul 2026
MET
RE: Cushwake & MicroLink
Google Calendar
15 Jul 2026
MET
Cushwake & MicroLink
Google Calendar
6 Jul 2026
MET
no title recorded
Google Calendar
25 Jun 2026
MET
Pluck'd Carroll County Site Discussion (MicroLink)
Google Calendar
22 Jun 2026
MET
no title recorded
Google Calendar
9 Jun 2026
MET
Cushman & Wakefield and MicroLink
Google Calendar
OPEN ACTIONSNONE OPEN
Nothing is owed on the record.
WHERE WE INTERSECT
DOMAINcushwake.comorganisations.domain
SITESCAPTUREManual
OVERLAPCAPTURETranscript
FUNDER IN COMMONCAPTUREGranola
DOCUMENTS SHAREDUPLOADSweep
INTRODUCED BYCAPTUREManual
MEETINGS12 ON FILE
20 AUG 2026RE: Cushman Wakefield and MicroLinkcalendar ledger, no probe
28 JUL 2026C&W/Microlinkcalendar ledger, no probe
23 JUL 2026RE: Cushwake & MicroLinkcalendar ledger, no probe
15 JUL 2026Cushwake & MicroLinkcalendar ledger, no probe
6 JUL 2026no title recordedcalendar ledger, no probe
25 JUN 2026Pluck'd Carroll County Site Discussion (MicroLink)calendar ledger, no probe
22 JUN 2026no title recordedcalendar ledger, no probe
9 JUN 2026Cushman & Wakefield and MicroLinkcalendar ledger, no probe
DATE NOT RECORDEDno title recordedoutside tenant
DATE NOT RECORDEDno title recordedoutside tenant
DATE NOT RECORDEDno title recordedoutside tenant
DATE NOT RECORDEDno title recordedoutside tenant
KEY FACTS
Domaincushwake.com
ClassPartner
Ownernot set
StageIn dialogue
People12 on file
Record age57 days
SILENCE
Last touch20 Aug 2026
Quiet for60 days
Quietest personDave Fanning, never
MENTIONS
Made by themnone drawn
Made about themnone drawn
Corroboratednone yet
Contradictednone
FIT
Partner modelno evidence
Criteria evidenced0 of 14
Gates firedno evidence
COMPLETENESS
Filled7 of 19
Open slots12
Oldest fact23 Aug 2026
WHERE EACH FIELD COMES FROM
org_classes, the rule that placed each

class

organisations.domain

domain

org_people

people on file

organisations.created_at

record created

3 more sources

Granola transcripts Sep 2026; Nick's notebook p1, p9, p19, p29, p39, Granola transcripts 15, 17 and 24 Sep, Granola transcripts 15 and 24 Sep

COMMIT TO MEMORY
This record is suppressed by a committed forget.