Directory / belden.com
Tuesday 20 October 2026
BC
belden.com
ORGANISATIONbelden.com
7 PEOPLE ON FILEMET 61 DAYS AGO
Watched, weekly
IDENTIFIED
23 Aug 2026
CONTACTED
not yet
IN DIALOGUE
20 Aug 2026
TERMS
not yet
SIGNED
not yet
RELATIONSHIP
7 Oct 2026 design review and capability alignment (Kate Zandstra, Sean Russell, Olivia Obregon, Brian Kennedy, Henry Franc). Belden to propose follow up times and send a proposal before the November NVIDIA meeting.
Granola: Microlink / Belden Design Review
WHAT THEY WANTNEXT
Henry Franc asked for an Ohio One master contact list, data room access and the heat reuse partner list.
Granola: Microlink / Belden Design Review
WHAT THEY AREDRAWN FROM THE TRANSCRIPT
Met to talk through the data centre design, with a few emails back and forth since. Their strength is PLC controls, wide cabling and fibre racks, and there is a connection there around customised and unusual work, which is where they are actually good.
Open. The Design Review and Capability Alignment sits today at 17:00 with eleven on the invite. Vicinity is still not on it even though the pilot is theirs.
Manufacturer
- 124 year old, 1,000+ patents; Layer 1 and 2 network infrastructure; owns Ruckus and Precision OT
- White space and gray space: fibre, copper, racks, enclosures, PDUs, in rack cooling, rear door heat exchangers, direct to chip via partners, fault managed power, PON, BMS, SCADA, controls, cybersecurity
- Not engineer of record; support layer to EPC and technical contractors across the lifecycle
People
- Kate Zandstra; Brian Kennedy (global commercial lead, data centres); Mark Jones (Solutions Line Director); Henry Franc (data centre specialist); Christie Ketchum; Olivia Obregon (Americas execution); Sean Russell
PEOPLE HERE7 ON FILE
MENTIONED BYNOBODY HAS NAMED THEM YET
No mention of them in any other transcript.
WHO THEY MENTIONEDEACH ROW WRITES TO BOTH PROFILES
They have named nobody in a transcript held here.
WHAT THEY SAIDVERBATIM · FEEDS THE TODAY SHEET
"If not, I would certainly like to make sure that we get something in front of you prior to your November meeting with Anthropic."
"would Wednesday 10/7 at 10a CT work for your team?"
"our lead times are generally measured in weeks rather than years"
"You've got an amazing steel pad."
"So getting sort of that master list would be fantastic."
"is the conference you're attending next week Datacloud in Austin TX?"
IMPORTANT DATESCOMPANY LEVEL, PEOPLE ROLLED IN
20 Aug 2026
MET
Belden-Microlink intro call
Google Calendar
OPEN ACTIONSNONE OPEN
Nothing is owed on the record.
WHERE WE INTERSECT
MEETINGS2 ON FILE
KEY FACTS
Domainbelden.com
Classunclassified
Ownernot set
StageIn dialogue
People7 on file
Record age58 days
SILENCE
Last touch20 Aug 2026
Quiet for61 days
Quietest personeveryone shown has a touch
MENTIONS
Made by themnone drawn
Made about themnone drawn
Corroboratednone yet
Contradictednone
FIT
Modelno model for its class
Criteria evidencedno model
Gates firedno evidence
COMPLETENESS
Filled8 of 19
Open slots11
Oldest fact23 Aug 2026
CONNECTION MAPDASHED IS HEARSAY, ONE STEP REMOVED
The counterparty and what we oweMeetings held and people metOurs to answerNamed by them
WHERE EACH FIELD COMES FROM
Granola: Microlink / Belden Design Review
opportunities, relationship, what they want
organisations.domain
domain
org_people
people on file
organisations.created_at
record created
2 more sources
Granola transcript 15 Sep; Nick's notebook p1, p19, Granola
COMMIT TO MEMORY